Natividad Medical Center

Natividad Medical Center

Share on
  • Voluntary ADA Upgrades for Two Existing Patient Bathrooms within building 100 at Natividad.
  • New flooring, paint, and wall protection in the ICU unit of Natividad hospital.
  • Labor and Delivery Ward flooring Replacement.
  • New casework, flooring, and wall covering for Natividad Medical Center Engineering Office.
  • Emergency repair of VDF for chiller pump #2 in building 980 / 580.
  • Provide and install access controllers, readers, and wiring, and Double door replacement with electrified hardware for two buildings within Natividad Medical Center.
  • Constructing roof access platforms above Building 100 at Natividad Medical Center. Reconstruct the hospital building in accordance with CA Building Standards Code Title 19 and 24.
  • Installing a new redundant water heater at bldg 940 first floor, installing a fire barrier at (E) wall, and all associated minor fire sprinkler modifications.
  • Replacement of carpet tile and rubber base in Human Resources.

Project Details

Project Name:

Natividad Medical Center

Project Type:

Medical / Hospital

Location:

1441 Constitution Blvd, Salinas, CA 93906

Square Feet:

Various Projects
Scroll to Top